1 00:00:16,730 --> 00:00:14,110 [Music] 2 00:00:18,980 --> 00:00:16,740 Saturn five quarterly film reports 3 00:00:23,620 --> 00:00:18,990 number eleven Thomas Partridge during 4 00:00:26,150 --> 00:00:23,630 the period June July and August 1965 5 00:00:28,820 --> 00:00:26,160 development manufacturing and testing of 6 00:00:30,560 --> 00:00:28,830 s1c stages by the Boeing Company and the 7 00:00:35,209 --> 00:00:30,570 Marshall Center continued throughout the 8 00:00:37,729 --> 00:00:35,219 fourth the first full duration or 150 9 00:00:40,520 --> 00:00:37,739 second static firing of an s-1 sea stage 10 00:00:43,010 --> 00:00:40,530 for successfully performed on August 5th 11 00:00:46,430 --> 00:00:43,020 at the Marshall Center the 5f1 12 00:00:48,979 --> 00:00:46,440 engines of the test stage s1 CT produced 13 00:00:51,529 --> 00:00:48,989 for thrust of 7 and 1/2 million pounds 14 00:00:52,639 --> 00:00:51,539 all four other engines for gimbal 15 00:00:55,040 --> 00:00:52,649 satisfactorily 16 00:00:57,110 --> 00:00:55,050 the first firing using automatic check 17 00:01:04,100 --> 00:00:57,120 out equipment is presently scheduled for 18 00:01:07,399 --> 00:01:04,110 next court martial assembly of the first 19 00:01:09,950 --> 00:01:07,409 seven five booster flight stage s1 c1 20 00:01:12,200 --> 00:01:09,960 neared completion this quarter the inner 21 00:01:14,359 --> 00:01:12,210 tank watts tank forward skirt assembly 22 00:01:16,070 --> 00:01:14,369 was completed in late June and was 23 00:01:18,200 --> 00:01:16,080 transferred from the vertical Assembly 24 00:01:20,330 --> 00:01:18,210 Building to the horizontal assembly area 25 00:01:21,890 --> 00:01:20,340 for mating to the fuel tank thrust 26 00:01:24,590 --> 00:01:21,900 structure assembly which had been 27 00:01:26,420 --> 00:01:24,600 finished last quarter splicing of the 28 00:01:29,179 --> 00:01:26,430 two tank assemblies was accomplished on 29 00:01:31,090 --> 00:01:29,189 July 12 miscellaneous mechanical and 30 00:01:33,950 --> 00:01:31,100 electrical work is continuing 31 00:01:36,859 --> 00:01:33,960 installation of the 5f1 engines was 32 00:01:38,510 --> 00:01:36,869 finished August 28 the completed stage 33 00:01:40,670 --> 00:01:38,520 is scheduled for turn over to the 34 00:01:45,260 --> 00:01:40,680 quality and reliability assurance lab 35 00:01:48,289 --> 00:01:45,270 for checkout on September 27th assembly 36 00:01:50,870 --> 00:01:48,299 of the second flight stage s1 c2 also 37 00:01:52,999 --> 00:01:50,880 moved forward at Marshall hydrostatic 38 00:01:56,719 --> 00:01:53,009 testing of the fuel tank was completed 39 00:01:58,910 --> 00:01:56,729 in mid-august in addition the skin 40 00:02:01,010 --> 00:01:58,920 assemblies were welded to both the upper 41 00:02:03,560 --> 00:02:01,020 and lower launch tank both heads and 42 00:02:07,910 --> 00:02:03,570 first structure assembly was continued 43 00:02:11,119 --> 00:02:07,920 at MSFC in Marshalls world tests our 44 00:02:13,220 --> 00:02:11,129 theater tank for the s1 CS structural 45 00:02:15,350 --> 00:02:13,230 test stage was installed 46 00:02:18,020 --> 00:02:15,360 the fuel tank first structure assembly 47 00:02:20,360 --> 00:02:18,030 in mid-july and preparations are 48 00:02:23,839 --> 00:02:20,370 underway for structural load testing of 49 00:02:25,790 --> 00:02:23,849 the unit beginning in September at 50 00:02:28,070 --> 00:02:25,800 Marshall's me shoe assembly facility in 51 00:02:30,920 --> 00:02:28,080 New Orleans the Boeing Company achieved 52 00:02:33,650 --> 00:02:30,930 an important goal On June 27th when the 53 00:02:35,870 --> 00:02:33,660 first s1c stage to be assembled at Mishu 54 00:02:39,199 --> 00:02:35,880 was removed from the vertical Assembly 55 00:02:41,809 --> 00:02:39,209 Building the s-1 CD dynamic test stage 56 00:02:43,820 --> 00:02:41,819 was moved to the horizontal installation 57 00:02:45,949 --> 00:02:43,830 position in the flat area where 58 00:02:49,910 --> 00:02:45,959 installation of tubing and wiring is 59 00:02:52,910 --> 00:02:49,920 underway the thrust structure for the s1 60 00:02:56,900 --> 00:02:52,920 CF facilities checkout stage was moved 61 00:02:58,850 --> 00:02:56,910 into the VAB in mid July s1 CF will be 62 00:03:01,160 --> 00:02:58,860 the second stage to be assembled at 63 00:03:05,210 --> 00:03:01,170 Michou and the first to be checked out 64 00:03:07,250 --> 00:03:05,220 in the new stage test building after 65 00:03:10,339 --> 00:03:07,260 completion of hydrostatic testing the 66 00:03:12,289 --> 00:03:10,349 fuel tank for s1 CL was moved into the 67 00:03:14,780 --> 00:03:12,299 vertical assembly position and made it 68 00:03:17,539 --> 00:03:14,790 to the thrust structure here are the 5 69 00:03:20,059 --> 00:03:17,549 watt suction ducts were installed the 70 00:03:22,580 --> 00:03:20,069 inner tank watch tank and forward skirt 71 00:03:25,460 --> 00:03:22,590 were added to complete vertical assembly 72 00:03:27,979 --> 00:03:25,470 of the state's the S 1 CF was removed 73 00:03:30,410 --> 00:03:27,989 from the VAB on August 26th and 74 00:03:35,059 --> 00:03:30,420 transferred to the horizontal assembly 75 00:03:37,490 --> 00:03:35,069 area both heads for s1 c3 and for flight 76 00:03:40,809 --> 00:03:37,500 stages were completed during the quarter 77 00:03:44,180 --> 00:03:40,819 and work was underway on s1 c5 bulkheads 78 00:03:46,129 --> 00:03:44,190 s1 c3 was in the final phases of major 79 00:03:49,039 --> 00:03:46,139 component assembly while similar 80 00:03:52,580 --> 00:03:49,049 operations for s1 c4 were just getting 81 00:03:56,479 --> 00:03:52,590 underway Assembly of s1 c5 will start 82 00:03:58,759 --> 00:03:56,489 next for the change in manufacturing 83 00:04:00,949 --> 00:03:58,769 technique was inaugurated by Boeing in 84 00:04:03,860 --> 00:04:00,959 the form of the pocket milled or T 85 00:04:06,440 --> 00:04:03,870 stiffened wiring the application of this 86 00:04:09,229 --> 00:04:06,450 change will be used in s1 c4 and 87 00:04:11,780 --> 00:04:09,239 subsequent stages the new type of wiring 88 00:04:14,599 --> 00:04:11,790 will add strength as well as delete 89 00:04:21,249 --> 00:04:14,609 5,000 pounds of weight from the s-1 C 90 00:04:27,679 --> 00:04:25,159 the first successful full duration 395 91 00:04:30,920 --> 00:04:27,689 second cluster filing of the 5j two 92 00:04:32,929 --> 00:04:30,930 engines of the s2 battleship stage was 93 00:04:35,209 --> 00:04:32,939 accomplished on August tonight by North 94 00:04:37,459 --> 00:04:35,219 American Aviation space and information 95 00:04:40,670 --> 00:04:37,469 systems division at the Santa Susana 96 00:04:42,740 --> 00:04:40,680 field laboratory for area attempts to 97 00:04:45,439 --> 00:04:42,750 fire for duration have been terminated 98 00:04:48,469 --> 00:04:45,449 prematurely due to various malfunctions 99 00:04:50,480 --> 00:04:48,479 all of which were later rectified the 100 00:04:52,550 --> 00:04:50,490 battleship is now being prepared for the 101 00:04:54,800 --> 00:04:52,560 next phase of testing which includes 102 00:05:00,499 --> 00:04:54,810 flight engines gimbal systems and 103 00:05:03,230 --> 00:05:00,509 propellant utilization after completion 104 00:05:05,809 --> 00:05:03,240 of the s2 common bulkhead tests tagged 105 00:05:08,659 --> 00:05:05,819 late last quarter the tank arrived at 106 00:05:10,999 --> 00:05:08,669 Santa Susana on June 3rd the gaseous 107 00:05:13,300 --> 00:05:11,009 nitrogen first pressure test was 108 00:05:16,129 --> 00:05:13,310 successfully conducted on July 10 109 00:05:18,950 --> 00:05:16,139 cryogenic fill and drain tests had to be 110 00:05:21,860 --> 00:05:18,960 postponed because of insulation problems 111 00:05:23,990 --> 00:05:21,870 repairs to insulation were made for some 112 00:05:28,820 --> 00:05:24,000 of the activation completed and testing 113 00:05:29,959 --> 00:05:28,830 was resumed on August 21st at SN I D Co 114 00:05:32,330 --> 00:05:29,969 Beach facility 115 00:05:35,029 --> 00:05:32,340 modification of the tests tower for the 116 00:05:38,119 --> 00:05:35,039 structural test dynamic test stage was 117 00:05:40,329 --> 00:05:38,129 completed on July 16th body and flight 118 00:05:43,189 --> 00:05:40,339 load tests were completed on August 15 119 00:05:47,170 --> 00:05:43,199 these loads simulate the inertia of the 120 00:05:49,790 --> 00:05:47,180 s4b stage and Apollo spacecraft 121 00:05:52,070 --> 00:05:49,800 completion and ultrasonic inspection of 122 00:05:54,230 --> 00:05:52,080 bulkheads for the s2 facilities checkout 123 00:05:56,659 --> 00:05:54,240 stage were accomplished during the 124 00:05:59,180 --> 00:05:56,669 report period stage structural assembly 125 00:06:01,610 --> 00:05:59,190 and numismatic testing have been 126 00:06:06,439 --> 00:06:01,620 completed and the stage moved to station 127 00:06:08,390 --> 00:06:06,449 5 for cleaning the s2 t all system stage 128 00:06:10,790 --> 00:06:08,400 was inverted and placed on the stage 129 00:06:13,909 --> 00:06:10,800 hydrostatic sir for cleaning of liquid 130 00:06:15,760 --> 00:06:13,919 hydrogen tanks in July the wax tank had 131 00:06:18,649 --> 00:06:15,770 previously been cleaned with freon 132 00:06:22,399 --> 00:06:18,659 priming station 5 the liquid hydrogen 133 00:06:24,409 --> 00:06:22,409 feed lines were also installed the stage 134 00:06:26,930 --> 00:06:24,419 was then inverted to a first structure 135 00:06:29,600 --> 00:06:26,940 down attitude and returned to station 2 136 00:06:31,820 --> 00:06:29,610 for further component installation the 137 00:06:32,800 --> 00:06:31,830 fire j2 engines were also installed 138 00:06:36,220 --> 00:06:32,810 under thrust 139 00:06:38,320 --> 00:06:36,230 during august shipment of s2t to 140 00:06:42,070 --> 00:06:38,330 Marshalls Mississippi test facility is 141 00:06:44,800 --> 00:06:42,080 expected early next quarter the common 142 00:06:47,110 --> 00:06:44,810 bulkhead for s21 the first flight stage 143 00:06:49,480 --> 00:06:47,120 has been completed and manufacturer 144 00:06:53,050 --> 00:06:49,490 pockets for flight stages two and three 145 00:06:56,200 --> 00:06:53,060 is in partners at the electromechanical 146 00:06:57,430 --> 00:06:56,210 mock-up stage simulator area @s and ID's 147 00:06:59,950 --> 00:06:57,440 down a facility 148 00:07:01,900 --> 00:06:59,960 check out of the s2 separation system 149 00:07:05,260 --> 00:07:01,910 was successfully performed during the 150 00:07:06,820 --> 00:07:05,270 report period all s2 stage electrical 151 00:07:09,960 --> 00:07:06,830 and mechanical functions can be 152 00:07:12,400 --> 00:07:09,970 performed or simulated by the emm 153 00:07:15,280 --> 00:07:12,410 development of the basic program takes 154 00:07:16,960 --> 00:07:15,290 was completed and the emm functional 155 00:07:26,650 --> 00:07:16,970 demonstration was successfully 156 00:07:28,420 --> 00:07:26,660 accomplished the s4 the facilities 157 00:07:30,340 --> 00:07:28,430 checkout stage underwent final 158 00:07:33,190 --> 00:07:30,350 installation of equipment such as this 159 00:07:35,050 --> 00:07:33,200 auxiliary propulsion system module early 160 00:07:38,050 --> 00:07:35,060 this quarter a Douglas Aircraft Company 161 00:07:40,210 --> 00:07:38,060 alpha complex Sacramento test facility 162 00:07:42,190 --> 00:07:40,220 following successful completion of 163 00:07:46,300 --> 00:07:42,200 propellant loading tests at SAC those 164 00:07:48,969 --> 00:07:46,310 beta complex the facilities check out 165 00:07:51,760 --> 00:07:48,979 stage left Sacramento by chef June 10th 166 00:07:53,830 --> 00:07:51,770 on its way by of the Panama Canal to the 167 00:07:57,450 --> 00:07:53,840 Kennedy Space Center for use there in 168 00:08:00,010 --> 00:07:57,460 launch complex 34 check out operations 169 00:08:02,500 --> 00:08:00,020 following completion of Saturn 1b 170 00:08:05,469 --> 00:08:02,510 configuration battleship stage testing 171 00:08:07,870 --> 00:08:05,479 last quarter AJ - engine with restart 172 00:08:10,980 --> 00:08:07,880 capability was installed in preparation 173 00:08:14,080 --> 00:08:10,990 for a seven-five battleship testing 174 00:08:16,060 --> 00:08:14,090 during the initial test on July 1st a 175 00:08:18,100 --> 00:08:16,070 fire broke out as a result of an 176 00:08:20,529 --> 00:08:18,110 accumulation of hydrogen in the upper 177 00:08:22,630 --> 00:08:20,539 thrust cone area and the program was 178 00:08:24,969 --> 00:08:22,640 delayed approximately one month for a 179 00:08:28,180 --> 00:08:24,979 refurbishment of damaged components such 180 00:08:30,250 --> 00:08:28,190 as wiring and tubing the first 181 00:08:32,829 --> 00:08:30,260 successful full duration battleship 182 00:08:36,490 --> 00:08:32,839 firing with restart was accomplished on 183 00:08:38,589 --> 00:08:36,500 August 17th the stages j2 engine ran for 184 00:08:40,659 --> 00:08:38,599 three minutes before being cut off for a 185 00:08:43,270 --> 00:08:40,669 30-minute simulated orbital Coast 186 00:08:43,830 --> 00:08:43,280 periods it was then reignited for a 187 00:08:46,770 --> 00:08:43,840 three 188 00:08:48,990 --> 00:08:46,780 fifty-five second run a similar test on 189 00:08:51,930 --> 00:08:49,000 August 20th concluded the Battleship 190 00:08:53,970 --> 00:08:51,940 firing program at sector later stands 191 00:08:58,430 --> 00:08:53,980 number one will now be modified for use 192 00:09:00,540 --> 00:08:58,440 in acceptance testing of flight stages 193 00:09:03,120 --> 00:09:00,550 construction of the vertical checkout 194 00:09:04,790 --> 00:09:03,130 laboratory at sectoral continued with 195 00:09:07,440 --> 00:09:04,800 installation of ground support equipment 196 00:09:11,520 --> 00:09:07,450 the facility will be used for post 197 00:09:13,010 --> 00:09:11,530 static check out of flight stages at the 198 00:09:15,480 --> 00:09:13,020 Douglas Huntington Beach flat 199 00:09:19,440 --> 00:09:15,490 fabrication and assembly continued on 200 00:09:22,650 --> 00:09:19,450 the first two s4b five flight stages 501 201 00:09:25,410 --> 00:09:22,660 and 502 after removal from insulation 202 00:09:27,840 --> 00:09:25,420 chambers 501 was transferred to the 203 00:09:30,360 --> 00:09:27,850 assembly checkout tower complex for 204 00:09:34,230 --> 00:09:30,370 installation of components in the LH 2 205 00:09:36,180 --> 00:09:34,240 tank the propellant tanks for the 502 206 00:09:40,620 --> 00:09:36,190 stage are being assembled in position 207 00:09:42,660 --> 00:09:40,630 number 1 of the complex yes to forward 208 00:09:45,810 --> 00:09:42,670 skirt has been received from s and ID 209 00:09:48,180 --> 00:09:45,820 for use in conjunction with the s4b aft 210 00:09:51,360 --> 00:09:48,190 inter stage testing at Douglas next 211 00:09:54,390 --> 00:09:51,370 quarter conversion hardware for 212 00:09:57,300 --> 00:09:54,400 converting the s4 b 1b dynamic stage to 213 00:10:00,390 --> 00:09:57,310 a 7 fire configuration was weighed and 214 00:10:01,980 --> 00:10:00,400 balanced at Huntington Beach prior to 215 00:10:04,470 --> 00:10:01,990 shipment to the Marshall Center in 216 00:10:07,080 --> 00:10:04,480 harvest the forward skirt will be used 217 00:10:09,780 --> 00:10:07,090 in dynamic testing of the s4 BD 218 00:10:12,390 --> 00:10:09,790 instrument unit and Apollo spacecraft in 219 00:10:14,760 --> 00:10:12,400 October the earth inter stage will be 220 00:10:17,310 --> 00:10:14,770 stored until needed next year for 221 00:10:21,450 --> 00:10:17,320 dynamic testing of the entire Saturn 5 222 00:10:23,970 --> 00:10:21,460 vehicle the first j2 engine delivered by 223 00:10:25,770 --> 00:10:23,980 Rocketdyne to Marshall under wet initial 224 00:10:35,060 --> 00:10:25,780 static wiring during August in the 225 00:10:40,740 --> 00:10:37,500 the first of a series of environmental 226 00:10:43,140 --> 00:10:40,750 tests of the f1 engine was conducted by 227 00:10:46,250 --> 00:10:43,150 Rocketdyne in July at test stand 228 00:10:48,540 --> 00:10:46,260 1e edwards field laboratory california 229 00:10:50,490 --> 00:10:48,550 successful start and operation of the 230 00:10:53,550 --> 00:10:50,500 engine system was accomplished after 231 00:10:57,030 --> 00:10:53,560 high temperature conditioning at 135 232 00:10:58,890 --> 00:10:57,040 degrees Fahrenheit for 16 hours later a 233 00:11:00,260 --> 00:10:58,900 successful firing was performed 234 00:11:02,790 --> 00:11:00,270 following a low temperature 235 00:11:06,780 --> 00:11:02,800 environmental test simulating possible 236 00:11:09,600 --> 00:11:06,790 hold conditions at launch at Rocketdyne 237 00:11:12,030 --> 00:11:09,610 Canoga Park California plant a program 238 00:11:14,220 --> 00:11:12,040 aimed at improvement of f1 engine thrust 239 00:11:16,410 --> 00:11:14,230 chamber assembly techniques was underway 240 00:11:18,510 --> 00:11:16,420 as a result of hot gas leakage 241 00:11:21,030 --> 00:11:18,520 experienced in some recent production 242 00:11:23,340 --> 00:11:21,040 engines this series of operations which 243 00:11:25,380 --> 00:11:23,350 is expected to solve the problem covers 244 00:11:27,329 --> 00:11:25,390 assembly of the thrust chamber up to the 245 00:11:31,230 --> 00:11:27,339 point of installation in the brazing 246 00:11:33,329 --> 00:11:31,240 furnace activation of Rocketdyne snoo 247 00:11:35,640 --> 00:11:33,339 manufacturing building number 4 at 248 00:11:38,310 --> 00:11:35,650 Canoga Park is scheduled in early 249 00:11:40,470 --> 00:11:38,320 September f1 turbo pump and valve 250 00:11:42,300 --> 00:11:40,480 assembly operations were transferred to 251 00:11:44,370 --> 00:11:42,310 the new facility for manufacturing 252 00:11:47,430 --> 00:11:44,380 building number one in mid-august 253 00:11:51,329 --> 00:11:47,440 two large clean rooms were also readied 254 00:11:54,420 --> 00:11:51,339 for use the Marshall center's new single 255 00:11:56,880 --> 00:11:54,430 position f1 engine static test stand was 256 00:12:00,030 --> 00:11:56,890 activated on July 8 with a successful 257 00:12:03,090 --> 00:12:00,040 10-second firing on July 21st for 258 00:12:05,070 --> 00:12:03,100 duration 150 second firing of the one 259 00:12:08,490 --> 00:12:05,080 and one-half million pound thrust engine 260 00:12:11,370 --> 00:12:08,500 was successfully performed in all twelve 261 00:12:16,890 --> 00:12:11,380 firings totaling 16 and 1/2 minutes were 262 00:12:19,740 --> 00:12:16,900 held in the new stand this fourth all 263 00:12:23,190 --> 00:12:19,750 5f1 engines for the first seven five 264 00:12:24,960 --> 00:12:23,200 flight stage s1 c1 were received at 265 00:12:27,480 --> 00:12:24,970 marshall from Rocketdyne during the 266 00:12:29,190 --> 00:12:27,490 report period and underwent checkout and 267 00:12:36,740 --> 00:12:29,200 minor modification before being 268 00:12:42,720 --> 00:12:40,050 the j2 engine flight rating test series 269 00:12:45,570 --> 00:12:42,730 which was begun by Rocketdyne in May was 270 00:12:49,260 --> 00:12:45,580 completed on July 21st at services at a 271 00:12:52,020 --> 00:12:49,270 total of 25 firings accumulating 46 272 00:12:54,630 --> 00:12:52,030 minutes was performed deficiencies found 273 00:12:56,670 --> 00:12:54,640 during the frt series will be corrected 274 00:13:00,150 --> 00:12:56,680 prior to completion of engine 275 00:13:03,960 --> 00:13:00,160 qualification teardown of the frt engine 276 00:13:07,620 --> 00:13:03,970 J 2023 for engineering inspection began 277 00:13:10,110 --> 00:13:07,630 in August engine number J 2032 was 278 00:13:12,540 --> 00:13:10,120 acceptance tested and the 200k 279 00:13:15,350 --> 00:13:12,550 qualification test series will begin at 280 00:13:17,280 --> 00:13:15,360 Delta 2 test stand next port 281 00:13:22,650 --> 00:13:17,290 qualification tests are due to be 282 00:13:25,110 --> 00:13:22,660 completed by December 31st the last of 283 00:13:27,510 --> 00:13:25,120 the five j2 engines for the s2 all 284 00:13:31,770 --> 00:13:27,520 system stage were delivered to s and ID 285 00:13:33,870 --> 00:13:31,780 in June Rocketdyne has inaugurated use 286 00:13:35,880 --> 00:13:33,880 of a for access numerical control 287 00:13:38,180 --> 00:13:35,890 measuring inspection machine in 288 00:13:40,950 --> 00:13:38,190 connection with j2 injector assembly 289 00:13:42,600 --> 00:13:40,960 this automatic technique from its time 290 00:13:44,760 --> 00:13:42,610 reduction as well as increased 291 00:13:47,160 --> 00:13:44,770 reliability of measurement data and 292 00:13:49,860 --> 00:13:47,170 fulfills the Rocketdyne integrated 293 00:13:52,530 --> 00:13:49,870 systems approach of employing numerical 294 00:14:01,140 --> 00:13:52,540 control from design intent to finished 295 00:14:03,180 --> 00:14:01,150 component throughout the quarter ground 296 00:14:05,730 --> 00:14:03,190 test instrument units for assembled and 297 00:14:07,890 --> 00:14:05,740 tested design changes necessitated 298 00:14:10,320 --> 00:14:07,900 partial reassembly of the flight systems 299 00:14:13,320 --> 00:14:10,330 instrument unit at Marshall this quarter 300 00:14:16,140 --> 00:14:13,330 checkout is due in October assembly got 301 00:14:19,770 --> 00:14:16,150 underway on the breadboard test unit 500 302 00:14:21,630 --> 00:14:19,780 s T the vibration test unit was 303 00:14:23,880 --> 00:14:21,640 completed and delivered to Wiley labs 304 00:14:26,900 --> 00:14:23,890 Huntsville Alabama on August 20th 305 00:14:29,760 --> 00:14:26,910 testing will begin early next quarter 306 00:14:31,740 --> 00:14:29,770 the facility's checkout unit worships to 307 00:14:35,610 --> 00:14:31,750 Kennedy Space Center upon completion of 308 00:14:38,040 --> 00:14:35,620 assembly at Marshall in June virtually 309 00:14:39,840 --> 00:14:38,050 all 7/5 load tests and the structural 310 00:14:42,390 --> 00:14:39,850 test unit have been successfully 311 00:14:45,030 --> 00:14:42,400 completed based on test results the 312 00:14:47,040 --> 00:14:45,040 access door is being re-evaluated and 313 00:14:50,000 --> 00:14:47,050 further testing in this area may be 314 00:14:52,340 --> 00:14:50,010 conducted next quarter 315 00:14:54,770 --> 00:14:52,350 a second structural test unit assembled 316 00:14:56,930 --> 00:14:54,780 by IBM Huntsville using segments 317 00:14:59,300 --> 00:14:56,940 manufactured by North American Aviation 318 00:15:01,940 --> 00:14:59,310 was rejected by Marshall due to 319 00:15:03,500 --> 00:15:01,950 discrepancies another unit is now in 320 00:15:12,770 --> 00:15:03,510 assembly scheduled for delivery 321 00:15:15,200 --> 00:15:12,780 September 30th the Marshall setters 18 322 00:15:17,810 --> 00:15:15,210 and 1/2 acre 7 fire service armed 323 00:15:20,210 --> 00:15:17,820 umbilical test facility shown in this 324 00:15:22,220 --> 00:15:20,220 artist drawing neared completion during 325 00:15:25,460 --> 00:15:22,230 the report period and is scheduled for 326 00:15:27,500 --> 00:15:25,470 activation next quarter the new MSFC 327 00:15:31,270 --> 00:15:27,510 aerial will provide extensive facilities 328 00:15:34,250 --> 00:15:31,280 for testing of the four hold down arms 329 00:15:37,010 --> 00:15:34,260 three-tail service masts and nine 330 00:15:39,320 --> 00:15:37,020 service arms depicted here in muddled 331 00:15:41,900 --> 00:15:39,330 form that are to be used on the mobile 332 00:15:45,170 --> 00:15:41,910 or launcher for a launch complex 39 at 333 00:15:47,690 --> 00:15:45,180 Kennedy Space Center prior to official 334 00:15:50,390 --> 00:15:47,700 activation of the entire test facility 335 00:15:53,000 --> 00:15:50,400 the hold down arm test fed was in use 336 00:15:55,220 --> 00:15:53,010 this quarter testing of the initial set 337 00:15:57,950 --> 00:15:55,230 of hose-down arms was completed in late 338 00:16:00,590 --> 00:15:57,960 July and testing of a second set is 339 00:16:03,050 --> 00:16:00,600 currently in progress the first set has 340 00:16:07,040 --> 00:16:03,060 been shipped to KSC for installation at 341 00:16:08,960 --> 00:16:07,050 complex 39 the initial checkout and 342 00:16:11,690 --> 00:16:08,970 testing of the first of the facility's 343 00:16:13,760 --> 00:16:11,700 eight vehicle motion simulators this one 344 00:16:16,250 --> 00:16:13,770 for the Apollo command module mock-up 345 00:16:18,710 --> 00:16:16,260 were accomplished this quarter the 346 00:16:20,870 --> 00:16:18,720 simulator is driven by a hydraulic servo 347 00:16:22,820 --> 00:16:20,880 system capable of simulating total 348 00:16:25,040 --> 00:16:22,830 movement between vehicle and launcher 349 00:16:27,170 --> 00:16:25,050 during pre-launch and launch conditions 350 00:16:29,840 --> 00:16:27,180 produced by very high winds 351 00:16:31,820 --> 00:16:29,850 each simulator duplicates that portion 352 00:16:34,190 --> 00:16:31,830 of the vehicle skin containing 353 00:16:38,270 --> 00:16:34,200 associated umbilical connections and 354 00:16:40,250 --> 00:16:38,280 personnel access hatches five of the 355 00:16:42,230 --> 00:16:40,260 facility's eight simulators are equipped 356 00:16:45,170 --> 00:16:42,240 with elevator devices that simulate 357 00:16:47,120 --> 00:16:45,180 liftoff of the seven five vehicle the 358 00:16:49,490 --> 00:16:47,130 liftoff simulators were tested for the 359 00:16:51,530 --> 00:16:49,500 first time this quarter the elevator 360 00:16:54,140 --> 00:16:51,540 accelerates for a distance of eight feet 361 00:17:02,180 --> 00:16:54,150 with total travel of eleven feet eight 362 00:17:07,250 --> 00:17:04,390 at Marshall's Mississippi test facility 363 00:17:09,919 --> 00:17:07,260 Padres continued on construction of the 364 00:17:14,270 --> 00:17:09,929 test complexes s two stage static test 365 00:17:17,059 --> 00:17:14,280 stands designated a 2 and a 1 and the 366 00:17:21,740 --> 00:17:17,069 duo position s 1 C stage static test 367 00:17:23,870 --> 00:17:21,750 death on June 30th the s2 fit-up fixture 368 00:17:26,390 --> 00:17:23,880 which simulates the size and weight of 369 00:17:28,820 --> 00:17:26,400 the stage became the first seven program 370 00:17:31,880 --> 00:17:28,830 article shipped through MTFs new lock 371 00:17:36,350 --> 00:17:31,890 system the fixture was hung in the s2 a2 372 00:17:38,419 --> 00:17:36,360 test and in august construction and 373 00:17:40,880 --> 00:17:38,429 activation continued during the report 374 00:17:43,039 --> 00:17:40,890 period on facilities in MTF the 375 00:17:47,840 --> 00:17:43,049 laboratory and engineering complex and 376 00:17:51,649 --> 00:17:47,850 support services complex in summary June 377 00:17:53,690 --> 00:17:51,659 July and August 1965 four months of 378 00:17:56,390 --> 00:17:53,700 continuing seven five program 379 00:17:58,789 --> 00:17:56,400 advancement with milestones such as the 380 00:18:02,240 --> 00:17:58,799 first full duration fire engine static 381 00:18:05,149 --> 00:18:02,250 firing of an s-1 sea stage near 382 00:18:09,169 --> 00:18:05,159 completion of assembly of the first s1 c 383 00:18:11,899 --> 00:18:09,179 flight stage the first successful for 384 00:18:15,980 --> 00:18:11,909 duration fired engine powering of the s2 385 00:18:19,700 --> 00:18:15,990 battleship stage the first s for p5 386 00:18:22,430 --> 00:18:19,710 battleship stage static firing the 387 00:18:26,570 --> 00:18:22,440 beginning of f1 engine environmental 388 00:18:30,680 --> 00:18:26,580 testing completion of j2 engine flight 389 00:18:33,730 --> 00:18:30,690 rating tests assembly and testing of 390 00:18:37,190 --> 00:18:33,740 various ground test instrument units and